• Refurbishment of the Champagnat school swimming pool
  • Refurbishment of the Champagnat school swimming pool
  • Refurbishment of the Champagnat school swimming pool
  • Refurbishment of the Champagnat school swimming pool
  • Refurbishment of the Champagnat school swimming pool

Refurbishment of the Champagnat school swimming pool

École Champagnat

Category

Education, sports and leisure


Client

École Champagnat


Location

La Tuque (Québec) / Canada

Date

2025


Budget

3,5 M$

Area

595 m²


Credits

ABCP architecture


Description

The project involved the complete refurbishment of the pool, beach and adjacent premises. The waterproofing was redone, as were corrections to the concrete walls. The membrane was removed and replaced with ceramic. Several pieces of equipment were also replaced.

 

The general appearance of the spaces was also reviewed to give this 50-year-old infrastructure a facelift. Wall and ceiling finishes were replaced, new lighting fixtures were installed and two large windows were drilled in one wall to let in natural light. Acoustic panels were installed to improve sound quality. Universal accessibility was also improved with the addition of steps.